Start with the report you have
A water quality report supports an initial review of the source, treatment target and candidate technologies. Share the original report with your project enquiry. If no report is available, describe the source and target first; the analytical scope can then be agreed.
Include the sampling context
Provide the sampling date and point, report issue date, laboratory, report reference and any available analytical methods or detection limits. Explain whether the sample represents normal operation, a seasonal condition or an unusual event. An older report may need updating if the source or process has changed.
Gather the relevant measurements
Where available, include pH, temperature, conductivity or TDS, turbidity or suspended solids, and relevant organic measures such as COD or TOC. Include the ions, metals or other components relevant to separation or recovery. For desalination, provide salinity and major-ion analysis. Keep units and methods; the required panel depends on the feedwater and proposed process.
Add the project requirements
State expected flow or daily water demand, operating hours, intended water use and target quality. Include the current treatment process, country, site constraints and available power. These inputs help interpret the report in the context of the project.
Decide what needs testing next
Report review does not establish long-term flux, fouling, cleaning behaviour or on-site performance. Depending on the uncertainties, discuss additional local laboratory analysis, agreed sample testing or a pilot on actual feedwater. Testing location and responsibilities are agreed per project; an overseas testing network is not assumed.
Ship samples only after agreement
If physical testing is needed, agree the sample collection, quantity, containers, preservation, receiving location and transport arrangements with the testing team before dispatch. The international enquiry starts with information, rather than a shipment.
Download the water report checklistBased on company water testing and membrane selection materials. For general RO/NF feedwater-analysis and design context, see the DuPont FilmTec RO/NF Technical Manual; it does not specify SNANO product performance. This guide supports project discussions; model-specific controlled technical documents and engineering design remain the basis for implementation.